- Size of the home (both heated and non-heated areas)
- Type of site work required (clearing, grading, digging basement, etc.)
- Amount of detailed features in the home
- Weather
- Availability of materials
The majority of the homes we have been building take less than 5 months to as many as 10 months. This slideshow makes it look incredibly quick!
At Master Plan Homes Inc, Jon and I are licensed residential builders that want to build our homes in a timely manner without sacrificing the integrity of the job.
.
No comments:
Post a Comment